ACES.
← All standard documentsDownload original Markdown

HTML reading edition of the supplied document. The original download is preserved unchanged.

On this page

ACES release procedure

Procedure version 1.0. Effective 5 November 2026.

Initial framework record

Framework adoption, current-member acceptance on the coordinator's confirmation, and Reuven Farchi's initial contributor acceptance are complete as recorded in Notices.md. Do not require those steps to be repeated before publishing this package. The remaining initial release tasks are deployment and publication-record operations.

Each public release

Public disclosure can be relevant prior art depending on content, accessibility and timing. It does not stop every patent filing, invalidate earlier patents or prevent protection of genuinely new improvements. Publication decisions for new potentially patentable material must account for possible loss of filing rights. See the primary sources in SOURCES.md.

Before Approved Specification designation

Apply Governance.md: identify the frozen candidate and complete required portions, conduct the announced review, preserve the actual CSL exclusion opportunities, resolve recorded exclusions and known blocking licensing issues affecting required features, and record consensus, authority, exact version and approval date. These are technical-approval gates, not a new adoption process for the effective framework.

Before product certification

Apply TRADEMARKS.md: establish rights and delegation, adopt the operator and assessment rules, and publish permitted claims, scope, renewal and appeals. Do not describe a draft implementation or consortium membership as product certification.